Engineering Approvals
Role of the Engineering Approvals Department is to provide location related services for Section 17 Projects. Investors visit Engineering Approvals Department at four occasions during the implementation period of their respective projects.
Site Approval
Before signing the agreement with the BOI, investor is supposed to obtain an approval for the proposed site, from the BOI. The approval process includes a site inspection and a brief study about the environmental impacts on future project and vise versa. A letter confirming the suitability of the site is issued to the investor at the end. This is a pre-requisite for signing the Agreement, with the BOI on the project
Building Plan Approval
After signing the agreement, and before commencing construction at the site, it is required to obtain an approval for the building plans from the Engineering Approvals Department of BOI. “BOI guidelines for factory building”, explains in detail, the submission requirements and other information, the investor need to know with this regard.
Quantity Certification
Section 17 BOI projects are entitled to import construction items/materials for their projects, provided the item type is not included in the “negative list”. Engineering Approvals Department assists the investor by recommending the quantities of these items/materials, shipment by shipment basis to the Customs, after checking them against the plans and the BOQ.
Certificate of Conformity
Once the construction of the building is completed, Engineering Approvals Department visits the site for the final inspection. Certificate of Conformity (COC) is issued if the construction is completed in accordance with the approved plans and the premises is ready for the commercial operations. COC is a pre- requisite for commencing commercial operations.