Zones

Location

BOI Export Processing Zones

Zone information

  • General Information
  • Zone Layout
  • Applicable BOI Charges
  • Infrastructure Facilities
  • Other Services
  • Other Cost Factors
  • Contact Details
LocationWestern Province, Gampaha District, Katana & Negombo Divisional Secretariats
Year of Commencement1978
Distance from Colombo29km
Total Extent513 Acres
Industrial Area330 Acres
Worker Population31,347(Female :17844, Male:13503)
Specialization of ZoneLargest Zone in the country with close proximity to the Bandaranaike International Airport, accommodating enterprises from different sectors and declared as a bonded area for Hub operations.

Zone Information

  • Location: 29 Km North-East of Colombo and opposite the Colombo (Katunayake) International Airport
  • Transport: Rail facilities, Bus terminal and Dry Port facility for import & export cargo
  • Area: 215 ha. (Flat land)
  • Environmental: Sewage and effluent collection system. Sewage/effluent treatment capacity of 12,000 m3 per day. Landscaping
  • Access: Asphalt paved road access available to all plots
  • Security & Fire Services: Security lighting. Chain link fencing, and round the clock security for entire areas by the BOI. Fire engines and firefighting equipment supported by hydrant system
  • Communication Facilities: 2,000 Lines stored Programme Control Exchange for local calls. IDD, telex and facsimile facility
  • Water: Adequate supply treated to WHO standards Storage facility within Zone 2.25 million gallons
  • Power Availability: 63 MVA through grid sub-station
  • Centralized: An Administrative Complex housing the BOI servicing units. Customs, Bank, Postal, Medical, Port Cargo Handling services etc.
Land PremiumUS $60,000 per acre (Minimum Rate / Period of lease – 50 years)
Ground RentUS $5,130.00 per acre per annum
Water ChargesRs. 75.00 per Cubic Meter + Monthly Service Charge
Waste Water ChargesRs. 17.00 per Cubic Meter
Solid Waste Disposal ChargesRs. 605.00 per Metric Ton

*All charges are liable for VAT

  • Asphalt concreted internal road network
  • Central Effluent Treatment Plant facility
  • Potable water up to WHO standards
  • Solid Waste disposal facility
  • Dedicated Grid Sub-Station (63 MVA)
  • Telecommunication (Telephone, e-mail, Internet, Wi-Fi)
  • Security Lighting

Services Provided by BOI

  • Engineering approvals & guidance
  • Export / Import Documentation
  • Cargo Verification
  • Advisory service & guidance on industrial relations
  • 24 X 7 fire service with firefighting, monitoring & advisory services
  • 24 X 7 overall security coverage
  • Environment monitoring, advisory & laboratory services
  • Internal Bus Services for Workers
  • Playground and Sports Complex for workers
  • Leisure Park for Zone Employees (under construction)
  •  

Services Provided by other State Agencies

  • Free healthcare facilities for workers
  • Meditation & Counseling Centre
  • Sri Lanka Customs

Available commercial facilities

  • Commercial Banks
  • Industrial Waste Handling & Disposal Facility
  • Freight Forwarding & Container Yard
  • Postal Services
  • Insurance
  • Healthcare facilities for workers

Average current market salary scales for following positions in manufacturing sector in BOI Enterprises (As at November 2020)

In Western Province In Other Provinces
LKR US$ (184.31 – ER) LKR US $(184.31-ER)
Factory Plant Level
Trainees Rs. 15,000.00 US $81.38 Rs. 13,500.00 US $73.25
Unskilled Rs. 18,000.00 US $97.60 Rs. 13,500.00 US $73.25
Semiskilled Rs. 20,000.00 US $108.50 Rs. 15,000.00 US $81.38
Skilled Rs. 35,000.00 US $189.89 Rs. 30,000.00 US $162.76
Supervisory Rs. 40,000.00 US $217.00 Rs.35,000.00 US $189.89
Technical (Non Executive) Rs.40,000.00 US $217.00 Rs.35,000.00 US $189.89
Technical (Executive) Rs.45,000.00 US $244.15 Rs.40,000.00 US $217.02
Manager Rs.150,000.00 US $813.84 Rs.130,000.00 US $705.30
Senior Manager Rs.250,000.00 US $1356.40 Rs.200,000.00 US $1085.12
Office / Administrative Level
Office Aide Rs. 18,000.00 US $97.60 Rs.16,000.00 US $86.80
Clerical & Allied Rs. 30,000.00 US $162.76 Rs. 25,000.00 US $135.64
Executives Rs. 40,000.00 US $217.00 Rs. 35,000.00 US $189.89
Manager Rs. 125,000.00 US $678.20 Rs. 100,000.00 US $542.56
Senior Manager Rs. 175,000.00 US $949.48 Rs. 150,000.00 US $813.84
Employer has to contribute 12% for Provident Fund and 3% for Trust Fund of the above

Construction Charges :

Factory Building – Approximately Rs. 40,000.00 per sq.mtr Warehouse – Approximately Rs. 36,000.00 per sq.mtr

Fuel Price :

Petrol – Rs. 137.00 per ltr Diesel – Rs. 104.00 per ltr

Transport Cost :

20′ Container – Rs. 200.00 per Km 40′ Container – Rs. 250.00 per Km

Power Tariff : Ceylon Electricity Board

Mr. H S K Fernando

Director - Zones (Katunayake EPZ)

Telephone: 011-2252362

Mobile        :  077-7986474

  • General Informatiion
  • Zone Layout
  • Applicable BOI Charges
  • Infrustructure Facilities
  • Other Cost Factors
LocationWestern Province, Gampaha District, Biyagama Divisional Secretariat
Year of Commencement1985
Distance from Colombo24 km
Total Extent450.95 Acres
Industrial Area268.95  Acres
Worker Population27,966(Female :10839, Male:17127)
Specialization of Zone2nd largest zone in the country with the largest Common Waste Water Treatment Plant.  Recommending for dry operations.   Awarded as green zone in 2012.

Zone Information

  • Location: Gampaha District In close proximity to the Colombo Port, Bandaranaike International Airport and Central Verification Terminal
  • Transport: Common bus terminal, public transport service and convenient door to door transport facilities by the enterprises through various service providers
  • Area:450.95 acres (flat land)
  • Environmental: Well-equipped environment monitoring, advisory and laboratory services 
  • Access: Asphalt concrete road access available to all plots
  • Security & Fire Services: Security lighting. Chain link fencing, and round the clock security for entire areas by the BOI. Fire engines and firefighting equipment supported by hydrant system
  • Communication Facilities: 4,000 lines existing exchange and a new ISDN (Integrated Services Digital Network) exchange with 1000-line capacity for local calls, IDD,  and facsimile facilities & ISDN & ADSL facilities as well.
  • Water: Adequate supply of treated to WHO standards. with ground Storage facility of 2 million gallons within the Zone. Total capacity 30,000 m3/d
  • Power Availability: 45 MVA dedicated power supply through grid sub-station
  • Centralized: Administrative Complex housing the BOI service units, Banks, Sri Lanka Customs, freight forwarding companies, Postal etc, within the Zone.
Land PremiumUS $60,000 (Minimum Rate / Period of lease – 50 years)
Ground RentUS$ 5,130.00 per acre per annum
Water ChargesRs. 75.00 per Meter + Monthly Service Charge
Waste Water ChargesRs. 17.00 per Meter

        *All charges are liable for VAT

  • Asphalt concrete road access available to all plots
  • 45 MVA dedicated power supply through grid sub-station
  • Adequate supply of treated to WHO standards. with ground Storage facility of 2 million gallons within the Zone. Total capacity 30,000 m3/day.
  • 4,000 lines existing exchange and a new ISDN (Integrated Services Digital Network) exchange with 1000 line capacity for local calls, IDD, telex and facsimile facilities & ISDN & ADSL facilities as well
  • Common bus terminal, public transport service and convenient door to door transport facilities by the enterprises through various service providers
  • Environmental pollution control laboratory. Sewage/effluent collection, treatment and disposal. Storm water disposal. Landscaping, integrated waste management system
  • Security lighting. Chain link fencing, and round the clock security for entire areas by the BOI. Fire engines and fire fighting equipment supported by hydrant system.
  • Administrative Complex housing the BOI service units, Banks, Sri Lanka Customs, Cargo handling, Library, cafeteria, Postal & Medical facilities etc, within the Zone.

Average current market rates of wages/salaries in BOI Enterprises (Manufacturing Sector):

 In Western ProvinceIn Other Provinces
SRSUS $
(Rs.125.00 = 01 US $)
SRSUS $
(Rs.125.00 = 01 US $)
Factory Plant Level    
TraineesRs. 10,000.00US $80.00Rs. 9,000.00US $72.00
UnskilledRs. 10,500.00US $84.00Rs. 10,000.00US $80.00
SemiskilledRs. 12,500.00US $100.00Rs. 12,000.00US $96.00
SkilledRs. 16,000.00US $128.00Rs. 14,000.00US $112.00
SupervisoryRs. 20,000.00US $160.00Rs.17,500.00US $140.00
Technical (Non Executive)Rs.30,000.00US $240.00Rs.25,000.00US $200.00
Technical (Executive)Rs.40,000.00US $320.00Rs.35,000.00US $280.00
ManagerRs.75,000.00US $600.00Rs.60,000.00US $480.00
Senior ManagerRs.125,000.00US $1000.00Rs.100,000.00US $800.00
Office / Administrative Level    
Office AideRs. 10,000.00US $80.00Rs.10,000.00US $80.00
Clerical & AlliedRs. 20,000.00US $160.00Rs. 15,000.00US $120.00
ExecutivesRs. 30,000.00US $240.00Rs. 25,000.00US $200.00
ManagerRs. 60,000.00US $480.00Rs. 50,000.00US $400.00
Senior ManagerRs. 100,000.00US $800.00Rs. 80,000.00US $640.00
Employer has to contribute 12% for Provident Fund and 3% for Trust Fund of the above

 

Construction Charges :

Factory Building – Approximately Rs. 40,000.00 per sq.mtr
Warehouse – Approximately Rs. 36,000.00 per sq.mtr

 

Fuel Price :

Petrol – Rs. 150.00 per ltr
Diesel – Rs. 111.00 per ltr

 

Transport Cost :

20′ Container – Rs. 200.00 per Km
40′ Container – Rs. 250.00 per Km

 

Power Tariff : Ceylon Electricity Board

  • General Information
  • Zone Layout
  • Applicable BOI Charges
  • Infrustructure Facilities
  • Other Services
  • Other Cost Factors
  • Contact Details
LocationWestern Province, Colombo District, Seethawake Divisional
Year of Commencement1999
Distance from Colombo50 Km
Total Extent431 Acres
Industrial Area184 Acres
Worker Population21,916 (Female: 9616, Male: 3297)
Specialization of ZoneOnly zone located in Colombo district Accommodating enterprises from different sectors

Zone Information

  • Location: 57Km away from Colombo
  • Transport: —
  • Area: 431 Acres
  • Environmental: Sewage & Effluent Collection System. Sewage / Effluent Treatment Capacity of 9900m³/d
  • Access: Bitumen surfaced road access available
  • Security & Fire Services: Security lighting, chain link fencing, Fire engine and firefighting equipment
  • Communication Facilities: 400 lines stored programmer control exchange for local calls, IDD, and facsimile facility
  • Water: Supply treated water as per WHO standards storage facility within the zone in 9950m³
  • Power Availability: 63 MVA
  • Centralized: Administrative complex, housing the BOI servicing units, entrance building.
Land PremiumUS $60,000 (Minimum Rate / Period of lease – 50 years)
Ground RentUS $4,660.00 per acre per annum
Water ChargesRs. 75.00 per m3 + Monthly Service Charge
Waste Water ChargesRs. 17.00 per m3
Solid Waste Disposal ChargesRs.3593.70 per Metric Ton (50% for the cost)

*All charges are liable for VAT

  • Water & wastewater treatment facilities, road, electricity & communication facility

Services Provided by BOI

  • Engineering Approvals & Guidance
  • Advisory Service & Guidance on Industrial Relations Cargo Verification
  • 24 X 7 Fire Service with Fire Fighting, Monitoring & Adversary Services
  • 24 X 7 Overall security coverage
  • Environment Monitoring & Adversary Services

 

Available Commercial Facilities

  • Commercial Banks & ATM Facilities

Average current market salary scales for following positions in manufacturing sector in BOI Enterprises (As at November 2020)

In Western Province In Other Provinces
LKR US$ (184.31 – ER) LKR US $(184.31-ER)
Factory Plant Level
Trainees Rs. 15,000.00 US $81.38 Rs. 13,500.00 US $73.25
Unskilled Rs. 18,000.00 US $97.60 Rs. 13,500.00 US $73.25
Semiskilled Rs. 20,000.00 US $108.50 Rs. 15,000.00 US $81.38
Skilled Rs. 35,000.00 US $189.89 Rs. 30,000.00 US $162.76
Supervisory Rs. 40,000.00 US $217.00 Rs.35,000.00 US $189.89
Technical (Non Executive) Rs.40,000.00 US $217.00 Rs.35,000.00 US $189.89
Technical (Executive) Rs.45,000.00 US $244.15 Rs.40,000.00 US $217.02
Manager Rs.150,000.00 US $813.84 Rs.130,000.00 US $705.30
Senior Manager Rs.250,000.00 US $1356.40 Rs.200,000.00 US $1085.12
Office / Administrative Level
Office Aide Rs. 18,000.00 US $97.60 Rs.16,000.00 US $86.80
Clerical & Allied Rs. 30,000.00 US $162.76 Rs. 25,000.00 US $135.64
Executives Rs. 40,000.00 US $217.00 Rs. 35,000.00 US $189.89
Manager Rs. 125,000.00 US $678.20 Rs. 100,000.00 US $542.56
Senior Manager Rs. 175,000.00 US $949.48 Rs. 150,000.00 US $813.84
Employer has to contribute 12% for Provident Fund and 3% for Trust Fund of the above

Construction Charges :

Factory Building – Approximately Rs. 40,000.00 per sq.mtr Warehouse – Approximately Rs. 36,000.00 per sq.mtr

Fuel Price :

Petrol – Rs. 137.00 per ltr Diesel – Rs. 104.00 per ltr

Transport Cost :

20′ Container – Rs. 200.00 per Km 40′ Container – Rs. 250.00 per Km

Power Tariff : Ceylon Electricity Board

Mr. K A D N Kumarapeli

Director - Zone (Seethawaka EPZ)

Telephone: 036-2231082

Mobile       : 077- 7808756

  • General Information
  • Zone Layout
  • Applicable BOI Charges
  • Infrustructure Facilities
  • Other Services
  • Other Cost Factors
  • Contact Details
LocationWestern Province, Kalutara District Ingiriya Divisional Secretariat
Year of Commencement1999
Total Extent391 Acres
Industrial Area189 Acres
Worker Population3423 (Female: 637, Male:2786)

Zone Information

  • Location: 80 Km away from Bandaranayake International AirPort & 55 Km from Colombo Port
  • Transport:16 Km from Horana Export Processing Zone to Southern Highway.
  • Area: 391 Acres
  • Environmental: Sewerage and effluent collection system. Sewage/ effluent treatment capacity 1000m3/day
  • Access: Asphalt concreted internal road access available to all plots.
  • Security: 24 hrs. security service, chain Link fencing and security lighting.
  • Communication Facilities: Telephone, e-mail, internet, 200 Nos. SLT Lines
  • Water: Potable water up to WHO standards 3000 m3 /day
  • Power Availability: Dedicated Grid sub-station 63 MVA
Land PremiumUS $30,000 (Minimum Rate / Period of lease – 50 years)
Ground RentUS $4,660.00 per acre per annum
Water ChargesRs. 75.00 per Cubic Meter + Monthly Service Charge
Waste Water ChargesRs. 17.00 per Cubic Meter

*All charges are liable for VAT

Average current market salary scales for following positions in manufacturing sector in BOI Enterprises (As at November 2020)

In Western Province In Other Provinces
LKR US$ (184.31 – ER) LKR US $(184.31-ER)
Factory Plant Level
Trainees Rs. 15,000.00 US $81.38 Rs. 13,500.00 US $73.25
Unskilled Rs. 18,000.00 US $97.60 Rs. 13,500.00 US $73.25
Semiskilled Rs. 20,000.00 US $108.50 Rs. 15,000.00 US $81.38
Skilled Rs. 35,000.00 US $189.89 Rs. 30,000.00 US $162.76
Supervisory Rs. 40,000.00 US $217.00 Rs.35,000.00 US $189.89
Technical (Non Executive) Rs.40,000.00 US $217.00 Rs.35,000.00 US $189.89
Technical (Executive) Rs.45,000.00 US $244.15 Rs.40,000.00 US $217.02
Manager Rs.150,000.00 US $813.84 Rs.130,000.00 US $705.30
Senior Manager Rs.250,000.00 US $1356.40 Rs.200,000.00 US $1085.12
Office / Administrative Level
Office Aide Rs. 18,000.00 US $97.60 Rs.16,000.00 US $86.80
Clerical & Allied Rs. 30,000.00 US $162.76 Rs. 25,000.00 US $135.64
Executives Rs. 40,000.00 US $217.00 Rs. 35,000.00 US $189.89
Manager Rs. 125,000.00 US $678.20 Rs. 100,000.00 US $542.56
Senior Manager Rs. 175,000.00 US $949.48 Rs. 150,000.00 US $813.84
Employer has to contribute 12% for Provident Fund and 3% for Trust Fund of the above

Construction Charges :

Factory Building – Approximately Rs. 40,000.00 per sq.mtr Warehouse – Approximately Rs. 36,000.00 per sq.mtr

Fuel Price :

Petrol – Rs. 137.00 per ltr Diesel – Rs. 104.00 per ltr

Transport Cost :

20′ Container – Rs. 200.00 per Km 40′ Container – Rs. 250.00 per Km

Power Tariff : Ceylon Electricity Board

Senior Deputy Director (Horana EPZ)

Telephone: 034-2269752

  • General Information
  • Zone Layout
  • Applicable BOI Charges
  • Infrustructure Facilities
  • Other Services
  • Other Cost Factors
  • Contact Details
LocationWestern Province, Gampaha District, Attanagalla Divisional Secretariat
Year of Commencement1999
Distance from Colombo42 km
Total Extent123 Acres
Industrial Area67.84 Acres
Worker Population10436 (Female: 6838, Male:3598)
Specialization of ZoneGreenery Zone located at Gampaha district near to the Colombo Kandy Highway and close proximity to Colombo Kandy Expressway, accommodating enterprises from different sectors.

Zone Information

  • Location: Western Province, Gampaha District, Attanagalla Divisional Secretariat
  • Transport: Common bus and other  vehicles parking facility, Public Transport facility.
  • Area: 49.78 Ha (123 Acres)
  • Environmental: Low polluting industries would be located. Sewage and effluent collection system, Common Waste water treatment system, Storm water disposal and landscaping. Greenery environment
  • Access: Asphalt paved road access available to all plots.
  • Security & Fire Services: Security lighting and Chain link fencing 24hrs X 07 days security and Fire Service
  • Communication Facilities: 300 lines for local calls, IDD, and facsimile, Internet facilities, Fiber optic lines
  • Water: Total water requirement of the Zone is 1450 m3/day, 700 m3 per obtained Ranpokunagama water supply scheme, 200 m3 from tube well and transport from Mirigama by the Wathupitiwala zone and the enterprises.
  • Power Availability: 8MVA through grid substation
  • Centralized: Units of servicing departments of the BOI & utility management organizations housed in BOI Administrative Complex.
Land PremiumUS $50,000 (Minimum Rate / Period of lease – 50 years)
Ground RentUS $4,660.00 per acre per annum
Water ChargesRs. 75.00 per m3 + Monthly Service Charge
Waste Water Charges Rs. 17.00 per m3
Solid Waste Disposal ChargesRs. 4.60 per kilogram

*All charges are liable for VAT

  • 8MVA through grid substation
  • Total water supply to the Zone is 1450 m3/day, 700 m3 obtain from Ranpokunagama water supply scheme, 200 m3 from tube well and transport from Mirigama by the Wathupitiwala zone and the enterprises.
  • 300 lines for local calls, IDD, and facsimile, Internet facilities and Fiber optic lines.
  • Asphalt paved road access available to all plots
  • Sewage and effluent collection system, treatment system, storm water disposal and landscaping 
  • Solid waste disposal facility

Services Provided by BOI

  • Child care center

Available Commercial Facilities

  • Bank ATM machines available within the zone

Average current market rates of wages/salaries in BOI Enterprises (Manufacturing Sector):

 In Western ProvinceIn Other Provinces
SRSUS $
(Rs.125.00 = 01 US $)
SRSUS $
(Rs.125.00 = 01 US $)
Factory Plant Level  
TraineesRs. 10,000.00US $80.00Rs. 9,000.00US $72.00
UnskilledRs. 10,500.00US $84.00Rs. 10,000.00US $80.00
SemiskilledRs. 12,500.00US $100.00Rs. 12,000.00US $96.00
SkilledRs. 16,000.00US $128.00Rs. 14,000.00US $112.00
SupervisoryRs. 20,000.00US $160.00Rs.17,500.00US $140.00
Technical (Non Executive)Rs.30,000.00US $240.00Rs.25,000.00US $200.00
Technical (Executive)Rs.40,000.00US $320.00Rs.35,000.00US $280.00
ManagerRs.75,000.00US $600.00Rs.60,000.00US $480.00
Senior ManagerRs.125,000.00US $1000.00Rs.100,000.00US $800.00
Office / Administrative Level 
Office AideRs. 10,000.00US $80.00Rs.10,000.00US $80.00
Clerical & AlliedRs. 20,000.00US $160.00Rs. 15,000.00US $120.00
ExecutivesRs. 30,000.00US $240.00Rs. 25,000.00US $200.00
ManagerRs. 60,000.00US $480.00Rs. 50,000.00US $400.00
Senior ManagerRs. 100,000.00US $800.00Rs. 80,000.00US $640.00
Employer has to contribute 12% for Provident Fund and 3% for Trust Fund of the above

 

Construction Charges :

Factory Building – Approximately Rs. 40,000.00 per sq.mtr
Warehouse – Approximately Rs. 36,000.00 per sq.mtr

 

Fuel Price :

Petrol – Rs. 150.00 per ltr
Diesel – Rs. 111.00 per ltr

 

Transport Cost :

20′ Container – Rs. 200.00 per Km
40′ Container – Rs. 250.00 per Km

Power Tariff : Ceylon Electricity Board

Mr. T M D Thilakaratna

Director - New Zones (Wathupitiwala EPZ)

Telephone : 033-2281386

Mobile       : 077- 7808637

  • General Information
  • Zone Layout
  • Applicable BOI Charges
  • Infrustructure Facilities
  • Other Services
  • Other Cost Factors
  • Contact
LocationWestern Province, Gampaha District, Mirigama Divisional Secretariats
Year of Commencement1998
Distance from Colombo65 Km
Total Extent261 Acres
Industrial Area134 Acres
Worker Population2,254 (Female :1471, Male:783)
Specialization of ZoneEnvironment friendly with greenery Zone close to the Bandaranaike International Airport, accommodating Enterprises producing international brands. Cross sections of manufacturing sectors; Foreign owned, Local & Joint Ventures.

Zone Information

  • Location: 65 Km North-East of Colombo and 36 Km from Colombo (Katunayake) International Airport
  • Transport: Rail facilities, Bus terminals, Dry Port facility for import & export cargo
  • Area: 105 ha.
  • Environmental: Landscaping
  • Access: Asphalt paved  road access available to all plots
  • Security & Fire Services: Security lighting. Chain link fencing, and round the clock security for entire areas by the BOI. Fire engines and firefighting equipment supported by hydrant system
  • Communication Facilities: Local and IDD,  facsimile, Internet facilities, SLT and Dialog optical fiber network available.
  • Water: Adequate supply treated to WHO standards Storage facility within Zone 900-meter cubes
  • Power Availability: 10 MVA through grid sub-station
  • Centralized: An Administrative building
Land PremiumUS $30,000 per acre (Minimum rate / Period of lease – 50 years)
Ground RentUS $4,660.00 per acre per annum
Water ChargesRs. 75.00 per m3 + Monthly Service Charge
Solid Waste Disposal ChargesNot yet implemented

*All charges are liable for VAT

  • Asphalt paved internal road network
  • Central Effluent Treatment Plant facility (950 m3 /day) – yet to be Commissioned
  • Potable water (2250 m3/day) up to WHO standards
  • Solid Waste disposal facility
  • Dedicated Grid Sub-Station (10 MVA)
  • Telecommunication (Telephone, facsimile, Internet)
  • Security lighting, Chain link fencing, Fire hydrant System

Services Provided by BOI

  • Export / Import Documentation
  • Cargo Verification
  • Advisory service & guidance on industrial relations
  • 24 X 7 fire service with firefighting, monitoring & advisory services
  • 24 X 7 overall security coverage

 

Available Commercial Facilities

  • Banks, ATM

Average current market salary scales for following positions in manufacturing sector in BOI Enterprises (As at November 2020)

In Western Province In Other Provinces
LKR US$ (184.31 – ER) LKR US $(184.31-ER)
Factory Plant Level
Trainees Rs. 15,000.00 US $81.38 Rs. 13,500.00 US $73.25
Unskilled Rs. 18,000.00 US $97.60 Rs. 13,500.00 US $73.25
Semiskilled Rs. 20,000.00 US $108.50 Rs. 15,000.00 US $81.38
Skilled Rs. 35,000.00 US $189.89 Rs. 30,000.00 US $162.76
Supervisory Rs. 40,000.00 US $217.00 Rs.35,000.00 US $189.89
Technical (Non Executive) Rs.40,000.00 US $217.00 Rs.35,000.00 US $189.89
Technical (Executive) Rs.45,000.00 US $244.15 Rs.40,000.00 US $217.02
Manager Rs.150,000.00 US $813.84 Rs.130,000.00 US $705.30
Senior Manager Rs.250,000.00 US $1356.40 Rs.200,000.00 US $1085.12
Office / Administrative Level
Office Aide Rs. 18,000.00 US $97.60 Rs.16,000.00 US $86.80
Clerical & Allied Rs. 30,000.00 US $162.76 Rs. 25,000.00 US $135.64
Executives Rs. 40,000.00 US $217.00 Rs. 35,000.00 US $189.89
Manager Rs. 125,000.00 US $678.20 Rs. 100,000.00 US $542.56
Senior Manager Rs. 175,000.00 US $949.48 Rs. 150,000.00 US $813.84
Employer has to contribute 12% for Provident Fund and 3% for Trust Fund of the above

Construction Charges :

Factory Building – Approximately Rs. 40,000.00 per sq.mtr Warehouse – Approximately Rs. 36,000.00 per sq.mtr

Fuel Price :

Petrol – Rs. 137.00 per ltr Diesel – Rs. 104.00 per ltr

Transport Cost :

20′ Container – Rs. 200.00 per Km 40′ Container – Rs. 250.00 per Km

Power Tariff : Ceylon Electricity Board

Mr. T.M.D. Thilakaratna

Director (New Zones)

Telephone:  033-2276626

Mobile       :  077- 7808637

  • General Information
  • Zone Layout
  • Applicable BOI Charges
  • Infrustructure Facilities
  • Other Services
  • Other Cost Factors
  • Contact
LocationNorth Western Province, Kurunegala District, Polgahawela Divisional Secretariats
Year of Commencement2000
Distance from Colombo77 Km
Total Extent65 Acres
Industrial Area40 Acres
Worker Population3981 (Female: 3340, Male:641)
Specialization of ZoneAll public transport facilities to whole country can be obtained from this area

Zone Information

  • Location: North Western Province, Kurunegala District, Polgahawela Divisional Secretariats
  • Transport: 2 km from Kurunegala, Colombo road via Ambepussa through Polgahawela Kegalle Road
  • Area: 65 Acers
  • Environmental: Low polluting industries would be located. Sewage and effluent collection system, treatment system, storm water disposal and landscaping will be provided.
  • Access: Asphalt paved road access available to all plots.
  • Security & Fire Services: 24 hrs. security service, chain Link fencing and security lighting.
  • Communication Facilities: 50 lines for local calls, IDD, telex and facsimile facilities and SLT and Dialog optical fiber network available.
  • Water: Potable water up to WHO standard through NWS&DB 450m3 /day capacity available
  • Power Availability: 4MVA through dedicated 33kv HT line constructed up to the site
  • Centralized:
Land PremiumUS $ 20,000 per acre (Minimum rate / Period of lease – 50 years)
Ground RentUS $ 4,660.00 per acre per annum
Water ChargesRs. 75.00/per m3 + Monthly Service Charge
Waste Water Charges Rs. 17.00/per m3

*All charges are liable for VAT

Core Infrastructure

  • Asphalt concreted internal road network
  • Central Effluent Treatment Plant facility (400m3/day)
  • Potable water up to WHO standards (450 m3/day)
  • Dedicated Power Supply(4MVA) Telecommunication (Telephone, e-mail, Internet, Wi-Fi)

Supporting Infrastructure

  • Business: Bank, Insurance, Post Office facilities can be obtained from 1km away Polgahawela town
  • Administration: Administrative Office, In-house Security, Worker Transport, Medical Clinic & Healthcare
  • Quality of life/Recreational: Restaurants & Hotels facilities can be obtained from 10 to 20km away from main cities. Pinnawala elephant orphanage and Proposed Zoo situated 15km away from the Zone

 

--

Average current market salary scales for following positions in manufacturing sector in BOI Enterprises (As at November 2020)

In Western Province In Other Provinces
LKR US$ (184.31 – ER) LKR US $(184.31-ER)
Factory Plant Level
Trainees Rs. 15,000.00 US $81.38 Rs. 13,500.00 US $73.25
Unskilled Rs. 18,000.00 US $97.60 Rs. 13,500.00 US $73.25
Semiskilled Rs. 20,000.00 US $108.50 Rs. 15,000.00 US $81.38
Skilled Rs. 35,000.00 US $189.89 Rs. 30,000.00 US $162.76
Supervisory Rs. 40,000.00 US $217.00 Rs.35,000.00 US $189.89
Technical (Non Executive) Rs.40,000.00 US $217.00 Rs.35,000.00 US $189.89
Technical (Executive) Rs.45,000.00 US $244.15 Rs.40,000.00 US $217.02
Manager Rs.150,000.00 US $813.84 Rs.130,000.00 US $705.30
Senior Manager Rs.250,000.00 US $1356.40 Rs.200,000.00 US $1085.12
Office / Administrative Level
Office Aide Rs. 18,000.00 US $97.60 Rs.16,000.00 US $86.80
Clerical & Allied Rs. 30,000.00 US $162.76 Rs. 25,000.00 US $135.64
Executives Rs. 40,000.00 US $217.00 Rs. 35,000.00 US $189.89
Manager Rs. 125,000.00 US $678.20 Rs. 100,000.00 US $542.56
Senior Manager Rs. 175,000.00 US $949.48 Rs. 150,000.00 US $813.84
Employer has to contribute 12% for Provident Fund and 3% for Trust Fund of the above

Construction Charges :

Factory Building – Approximately Rs. 40,000.00 per sq.mtr Warehouse – Approximately Rs. 36,000.00 per sq.mtr

Fuel Price :

Petrol – Rs. 137.00 per ltr Diesel – Rs. 104.00 per ltr

Transport Cost :

20′ Container – Rs. 200.00 per Km 40′ Container – Rs. 250.00 per Km

Power Tariff : Ceylon Electricity Board

Mr. A S Prasanna Kumara

Senior Deputy Director (Polgahawela EPZ)

Telephone:  037-2241526

Mobile       :  077- 7986584

  • General Information
  • Zone Layout
  • Applicable BOI Charges
  • Infrustructure Facilities
  • Other Services
  • Other Cost Factors
  • Contact
LocationNorth Western Province, Kurunegala District, Mawathagama Divisional secretariat
Year of Commencement2000
Distance from Colombo106 km
Total Extent53 Acres
Industrial Area30 Acres
Worker Population5716 (Female: 4245, Male:1471)
Specialization of ZoneLow polluting and less water consuming Industries would be located

Zone Information

  • Location: North Western Province, Kurunegala District, Mawathagama Divisional secretariat
  • Transport:
  • Area: 53 Acres
  • Environmental: Low polluting and less water consuming Industries would be located. Sewage & effluent collection, treatment & disposal facilities: landscaping will be provided
  • Access: Bitumen surfaced road access available to all plots.
  • Security & Fire Services: Security lighting and chain link fencing
  • Communication Facilities: 100 lines for local calls, IDD, telex and facsimile facilities
  • Water: Water Supply through a series of tube wells producing up to 50,000 gallons/day and treated up to WHO standard on drinking water quality
  • Power Availability: 4MVA through dedicated 33kv HT line constructed up to the site
  • Centralized: An Administration building housing the all BOI service units
Land PremiumUS $ 10,000 per acre (Minimum rate/Period of lease 50 years)
Ground RentUS $ 4,660.00 per acre per annum
Water ChargesRs. 75.00 per m3 + Monthly Service Charge
Waste Water Charges Rs. 17.00 per m3

*All charges are liable for VAT

Core Infrastructure

  • Asphalt Concreted Internal Road Network
  • Central Effluent Plant facility
  • Potable Water up to WHO Standard
  • Dedicated Grid Sub-Station

Services Provided by BOI

  • Child care center

Available Commercial Facilities

  • Banks ATM

Average current market salary scales for following positions in manufacturing sector in BOI Enterprises (As at November 2020)

In Western Province In Other Provinces
LKR US$ (184.31 – ER) LKR US $(184.31-ER)
Factory Plant Level
Trainees Rs. 15,000.00 US $81.38 Rs. 13,500.00 US $73.25
Unskilled Rs. 18,000.00 US $97.60 Rs. 13,500.00 US $73.25
Semiskilled Rs. 20,000.00 US $108.50 Rs. 15,000.00 US $81.38
Skilled Rs. 35,000.00 US $189.89 Rs. 30,000.00 US $162.76
Supervisory Rs. 40,000.00 US $217.00 Rs.35,000.00 US $189.89
Technical (Non Executive) Rs.40,000.00 US $217.00 Rs.35,000.00 US $189.89
Technical (Executive) Rs.45,000.00 US $244.15 Rs.40,000.00 US $217.02
Manager Rs.150,000.00 US $813.84 Rs.130,000.00 US $705.30
Senior Manager Rs.250,000.00 US $1356.40 Rs.200,000.00 US $1085.12
Office / Administrative Level
Office Aide Rs. 18,000.00 US $97.60 Rs.16,000.00 US $86.80
Clerical & Allied Rs. 30,000.00 US $162.76 Rs. 25,000.00 US $135.64
Executives Rs. 40,000.00 US $217.00 Rs. 35,000.00 US $189.89
Manager Rs. 125,000.00 US $678.20 Rs. 100,000.00 US $542.56
Senior Manager Rs. 175,000.00 US $949.48 Rs. 150,000.00 US $813.84
Employer has to contribute 12% for Provident Fund and 3% for Trust Fund of the above

Construction Charges :

Factory Building – Approximately Rs. 40,000.00 per sq.mtr Warehouse – Approximately Rs. 36,000.00 per sq.mtr

Fuel Price :

Petrol – Rs. 137.00 per ltr Diesel – Rs. 104.00 per ltr

Transport Cost :

20′ Container – Rs. 200.00 per Km 40′ Container – Rs. 250.00 per Km

Power Tariff : Ceylon Electricity Board

Mr. M T Jayarathne

Senior Deputy Director (Mawathagama EPZ)

Telephone: 037-2298147

Mobile      : 077- 3784795

  • General Information
  • Zone Layout
  • Applicable BOI Charges
  • Infrustructure Facilities
  • Other Services
  • Other Cost Factors
  • Contact
LocationWestern Province, Gampaha District, Attanagalla Divisional Secretariat
Year of Commencement1998
Distance from Colombo38km
Total Extent32.80 Acres
Industrial Area26.32 Acres
Worker Population2108 (Female: 1619, Male: 489)
Specialization of ZoneSmall zone adjacent to A1 (Colombo – Kandy) highway. Close proximity to the proposed Colombo – Kandy expressway.

Zone Information

  • Location: Western Province, Gampaha District, Attanagalla Divisional Secretariat
  • Transport: Common bus and other heavy  vehicles parking facility, Public Transport facility.
  • Area: 13.27 Ha (32.80 Acres)
  • Environmental: Common Sewerage Treatment Plant capacity up to 450 m3/day, Greenery Environment.
  • Access: Asphalt concrete surfaced road access available to all plots
  • Security & Fire Services: Security lighting and Chain link fencing 24hrs X 07 days security and Fire Service
  • Communication Facilities: 300 lines for local calls, IDD, and facsimile, Internet facilities
  • Water: 200 m3 /day
  • Power Availability: 4 MVA
  • Centralized: Administrative building and cafeteria
Land PremiumUS $30,000 (Minimum Rate / Period of lease – 50 years)
Ground RentUS $ 4,660 per acre per annum
Water ChargesRs. 75.00 per m3 + Monthly Service Charge
Waste Water Charges Rs.17.00 per cubic meter

*All charges are liable for VAT

Core Infrastructure

  • Asphalt concreted internal road network
  • Common Waste Water Treatment Plant capacity up to 450 m3/day
  • Potable water through NWS & DB / 200 m3/day) & individual tube wells
  • Dedicated Grid Sub-Station (4 MVA)

Supporting Infrastructure

  • Business: Banks, insurance, post offices are located at Nittambuwa town within 03 kms.
  • Quality of life/Recreational: Cafeteria, Library, Horagolla National Park within close proximity.

Services Provided by BOI

  • Cargo Verification
  • Advisory service & guidance on industrial relations
  • 24 X 7 fire service with firefighting, monitoring & advisory services
  • 24 X 7 overall security coverage
  • Environment monitoring, advisory services

 

Available Commercial Facilities

  • Banks, ATM

Average current market salary scales for following positions in manufacturing sector in BOI Enterprises (As at November 2020)

In Western Province In Other Provinces
LKR US$ (184.31 – ER) LKR US $(184.31-ER)
Factory Plant Level
Trainees Rs. 15,000.00 US $81.38 Rs. 13,500.00 US $73.25
Unskilled Rs. 18,000.00 US $97.60 Rs. 13,500.00 US $73.25
Semiskilled Rs. 20,000.00 US $108.50 Rs. 15,000.00 US $81.38
Skilled Rs. 35,000.00 US $189.89 Rs. 30,000.00 US $162.76
Supervisory Rs. 40,000.00 US $217.00 Rs.35,000.00 US $189.89
Technical (Non Executive) Rs.40,000.00 US $217.00 Rs.35,000.00 US $189.89
Technical (Executive) Rs.45,000.00 US $244.15 Rs.40,000.00 US $217.02
Manager Rs.150,000.00 US $813.84 Rs.130,000.00 US $705.30
Senior Manager Rs.250,000.00 US $1356.40 Rs.200,000.00 US $1085.12
Office / Administrative Level
Office Aide Rs. 18,000.00 US $97.60 Rs.16,000.00 US $86.80
Clerical & Allied Rs. 30,000.00 US $162.76 Rs. 25,000.00 US $135.64
Executives Rs. 40,000.00 US $217.00 Rs. 35,000.00 US $189.89
Manager Rs. 125,000.00 US $678.20 Rs. 100,000.00 US $542.56
Senior Manager Rs. 175,000.00 US $949.48 Rs. 150,000.00 US $813.84
Employer has to contribute 12% for Provident Fund and 3% for Trust Fund of the above

Construction Charges :

Factory Building – Approximately Rs. 40,000.00 per sq.mtr Warehouse – Approximately Rs. 36,000.00 per sq.mtr

Fuel Price :

Petrol – Rs. 137.00 per ltr Diesel – Rs. 104.00 per ltr

Transport Cost :

20′ Container – Rs. 200.00 per Km 40′ Container – Rs. 250.00 per Km

Power Tariff : Ceylon Electricity Board

Mr. R A P K Ranasinghe

Senior Deputy Director (Malwatta EPP)

Telephone :  033-2296620

Mobile       :  077- 2375431

  • General Information
  • Zone Layout
  • Applicable BOI Charges
  • Infrustructure Facilities
  • Other Services
  • Other Cost Factors
  • Contact
LocationCentral Province, Kandy District, Kundasale Divisional Secretariats
Year of Commencement1994
Distance from Colombo133 km
Total Extent195 Acres
Industrial Area115 Acres
Worker Population7,484 (Female :5481, Male:2003)
Specialization of Zone —

Zone Information

  • Location: Kandy District, Kundasale Divisional secretariat on Kandy -Digana Road close to Victoria Reservoir
  • Transport: Bus terminus Dry Port facility for import & export cargo
  • Area: 195 Acres (87 ha)
  • Environmental: Individual sewage treatment plants Sewage/effluent treatment capacity of  20 m3 per day. Landscaping
  • Access: Asphalt concrete surfaced road access available to all plots
  • Security & Fire Services: Security lighting & Chain link fencing
  • Communication Facilities: optical fiber Internet Facility, 4G wireless communication
  • Water: Adequate supply of treated to WHO standards. Storage facility within Zone 1400m3 cu.
  • Power Availability: 12 MVA through grid sub-station
  • Centralized: An Administrative Complex servicing unit., Bank, Dry Port Cargo Handling services etc.
Land PremiumUS $10,000 (Minimum Rate / Period of lease – 50 years)
Ground RentUS $4,660.00 per acre per annum
Water ChargesRs. 75.00 per m3 + Monthly Service Charge
Waste Water Charges 1500/gully + Rs 60 /km

*All charges are liable for VAT

Core Infrastructure

  • Power Supply, Internal Roads, Perimeter Fence.

Services Provided by BOI

  • Engineering approvals & guidance
  • Export / Import Documentation
  • Cargo Verification
  • Advisory service & guidance on industrial relations
  • monitoring & advisory services
  • 24 X 7 overall security coverage
  • Environment monitoring, advisory 
  • Internal Bus Services for Workers

Services Provided by other State Agencies

  • Free healthcare advisory services.

Available Commercial Facilities

  • Commercial Banks
  •  Waste Handling & Disposal Facility

Average current market salary scales for following positions in manufacturing sector in BOI Enterprises (As at November 2020)

In Western Province In Other Provinces
LKR US$ (184.31 – ER) LKR US $(184.31-ER)
Factory Plant Level
Trainees Rs. 15,000.00 US $81.38 Rs. 13,500.00 US $73.25
Unskilled Rs. 18,000.00 US $97.60 Rs. 13,500.00 US $73.25
Semiskilled Rs. 20,000.00 US $108.50 Rs. 15,000.00 US $81.38
Skilled Rs. 35,000.00 US $189.89 Rs. 30,000.00 US $162.76
Supervisory Rs. 40,000.00 US $217.00 Rs.35,000.00 US $189.89
Technical (Non Executive) Rs.40,000.00 US $217.00 Rs.35,000.00 US $189.89
Technical (Executive) Rs.45,000.00 US $244.15 Rs.40,000.00 US $217.02
Manager Rs.150,000.00 US $813.84 Rs.130,000.00 US $705.30
Senior Manager Rs.250,000.00 US $1356.40 Rs.200,000.00 US $1085.12
Office / Administrative Level
Office Aide Rs. 18,000.00 US $97.60 Rs.16,000.00 US $86.80
Clerical & Allied Rs. 30,000.00 US $162.76 Rs. 25,000.00 US $135.64
Executives Rs. 40,000.00 US $217.00 Rs. 35,000.00 US $189.89
Manager Rs. 125,000.00 US $678.20 Rs. 100,000.00 US $542.56
Senior Manager Rs. 175,000.00 US $949.48 Rs. 150,000.00 US $813.84
Employer has to contribute 12% for Provident Fund and 3% for Trust Fund of the above

Construction Charges :

Factory Building – Approximately Rs. 40,000.00 per sq.mtr Warehouse – Approximately Rs. 36,000.00 per sq.mtr

Fuel Price :

Petrol – Rs. 137.00 per ltr Diesel – Rs. 104.00 per ltr

Transport Cost :

20′ Container – Rs. 200.00 per Km 40′ Container – Rs. 250.00 per Km

Power Tariff : Ceylon Electricity Board

Mr. M J K Mohottala

Director - Zone (Kandy Industrial Park- CRO)

Telephone:  081-2423991

Mobile       :  077- 7808291

  • General Information
  • Zone Layout
  • Applicable BOI Charges
  • Infrustructure Facilities
  • Other Services
  • Other Cost Factors
  • Contact
LocationSouthern Province, Galle District, Habaraduwa Divisional Secretariats
Year of Commencement1991
Distance from Colombo133 Km
Total Extent227 Acres
Industrial Area113 Acres
Worker Population12,913 (Female :9616, Male:3297)
Specialization of Zone
  • Declared as a bonded area for Hub operations.
  • Two access points to Southern Expressway.
  • 1- ½ hour to Hambantota international sea port.

Zone Information

  • Location: Galle District situated on the South Western fringe of the Koggala Lake
  • Transport: Rail facilities, Bus terminus Dry Port facility for import & export cargo
  • Area: 227 Acres (91 ha)
  • Environmental: Sewage and effluent collection system. Sewage/effluent treatment capacity of 675 m3 per day. Landscaping
  • Access: Asphalt concrete surfaced road access available to all plots
  • Security & Fire Services: Security lighting & Chain link fencing
  • Communication Facilities: Programme Control Exchange for local calls, IDD, telex and facsimile facility
  • Water: Adequate supply treated to WHO standards. Storage facility within Zone 1375m3(Drinking water & ground water)
  • Power Availability: 20 MVA through grid sub-station
  • Centralized: An Administrative Complex housing the BOI servicing units. Customs, Bank, Postal, Medical, Port Cargo Handling services etc.
Land PremiumUS $30,000 (Minimum Rate / Period of lease – 50 years)
Ground RentUS $5,130.00 per acre per annum
Water ChargesRs. 75.00 per m3 + Monthly Service Charge
Waste Water Charges Rs. 17.00 per m3
Solid Waste Disposal ChargesRs.1,500/= per month

*All charges are liable for VAT

Core Infrastructure

  • Asphalt concreted internal road network
  • Central Effluent Treatment Plant facility
  • Potable water up to WHO standards
  • Solid Waste disposal facility
  • Grid Sub-Station (20 MVA)
  • Telecommunication (Telephone, e-mail, Internet)

Services Provided by BOI

  • Engineering approvals & guidance
  • Export / Import Documentation
  • Cargo Verification
  • Advisory service & guidance on industrial relations
  • 24 X 7 monitoring & advisory services
  • 24 X 7 overall security coverage
  • Environment monitoring, advisory services
  • Playground for workers

Services Provided by other State Agencies

  • Free healthcare facilities for workers
  • Meditation & Counseling Centre
  • Sri Lanka Customs

Available Commercial Facilities

  • Commercial Banks
  • Industrial Waste Handling & Disposal Facility
  • Freight Forwarding 
  • Postal Services
  • Insurance

Average current market salary scales for following positions in manufacturing sector in BOI Enterprises (As at November 2020)

In Western Province In Other Provinces
LKR US$ (184.31 – ER) LKR US $(184.31-ER)
Factory Plant Level
Trainees Rs. 15,000.00 US $81.38 Rs. 13,500.00 US $73.25
Unskilled Rs. 18,000.00 US $97.60 Rs. 13,500.00 US $73.25
Semiskilled Rs. 20,000.00 US $108.50 Rs. 15,000.00 US $81.38
Skilled Rs. 35,000.00 US $189.89 Rs. 30,000.00 US $162.76
Supervisory Rs. 40,000.00 US $217.00 Rs.35,000.00 US $189.89
Technical (Non Executive) Rs.40,000.00 US $217.00 Rs.35,000.00 US $189.89
Technical (Executive) Rs.45,000.00 US $244.15 Rs.40,000.00 US $217.02
Manager Rs.150,000.00 US $813.84 Rs.130,000.00 US $705.30
Senior Manager Rs.250,000.00 US $1356.40 Rs.200,000.00 US $1085.12
Office / Administrative Level
Office Aide Rs. 18,000.00 US $97.60 Rs.16,000.00 US $86.80
Clerical & Allied Rs. 30,000.00 US $162.76 Rs. 25,000.00 US $135.64
Executives Rs. 40,000.00 US $217.00 Rs. 35,000.00 US $189.89
Manager Rs. 125,000.00 US $678.20 Rs. 100,000.00 US $542.56
Senior Manager Rs. 175,000.00 US $949.48 Rs. 150,000.00 US $813.84
Employer has to contribute 12% for Provident Fund and 3% for Trust Fund of the above

Construction Charges :

Factory Building – Approximately Rs. 40,000.00 per sq.mtr Warehouse – Approximately Rs. 36,000.00 per sq.mtr

Fuel Price :

Petrol – Rs. 137.00 per ltr Diesel – Rs. 104.00 per ltr

Transport Cost :

20′ Container – Rs. 200.00 per Km 40′ Container – Rs. 250.00 per Km

Power Tariff : Ceylon Electricity Board

Maj. Gamini Dahanayake

Director - Zone (Koggala EPZ)

Telephone:  091-2283372

Mobile       :  077- 3140200

  • General Information
  • Zone Layout
  • Applicable BOI Charges
  • Infrustructure Facilities
  • Other Services
  • Other Cost Factors
  • Contact
LocationSouthern Province, Hambantota District
Year of Commencement1999
Distance from Colombo233km
Total Extent565 Acres
Industrial Area458 Acres
Worker Population1300 (Female: 1168, Male:132)
Specialization of Zone —

Zone Information

  • Location: Located in Southern Province, Hambantota Divisional Secretariat is 233km from Colombo.
  • Transport: Staff and Public transport facilities
  • Area: 565 Acres
  • Environmental: Individual indoor treatment Plants
  • Access: Access via tar roads
  • Security & Fire Services: Barbeded & wire mesh incorporated with electric boundary fence. 24×7 hrs security service
  • Communication Facilities: Local & IDD Call, Facsimile, Internet Facilities
  • Water: 3,000 m3/day allocation
  • Power Availability: 25MVA Allocation
  • Centralized: Zone Mgt. through centralized Admin. building
Land PremiumUS $20,000 (Minimum Rate / Period of lease – 30 years)
Ground RentUS $4,235.00 per acre per annum
Water ChargesRs. 75.00 per m3 + Monthly Service Charge
Waste Water Charges  —

*All charges are liable for VAT

--

--

Average current market salary scales for following positions in manufacturing sector in BOI Enterprises (As at November 2020)

In Western Province In Other Provinces
LKR US$ (184.31 – ER) LKR US $(184.31-ER)
Factory Plant Level
Trainees Rs. 15,000.00 US $81.38 Rs. 13,500.00 US $73.25
Unskilled Rs. 18,000.00 US $97.60 Rs. 13,500.00 US $73.25
Semiskilled Rs. 20,000.00 US $108.50 Rs. 15,000.00 US $81.38
Skilled Rs. 35,000.00 US $189.89 Rs. 30,000.00 US $162.76
Supervisory Rs. 40,000.00 US $217.00 Rs.35,000.00 US $189.89
Technical (Non Executive) Rs.40,000.00 US $217.00 Rs.35,000.00 US $189.89
Technical (Executive) Rs.45,000.00 US $244.15 Rs.40,000.00 US $217.02
Manager Rs.150,000.00 US $813.84 Rs.130,000.00 US $705.30
Senior Manager Rs.250,000.00 US $1356.40 Rs.200,000.00 US $1085.12
Office / Administrative Level
Office Aide Rs. 18,000.00 US $97.60 Rs.16,000.00 US $86.80
Clerical & Allied Rs. 30,000.00 US $162.76 Rs. 25,000.00 US $135.64
Executives Rs. 40,000.00 US $217.00 Rs. 35,000.00 US $189.89
Manager Rs. 125,000.00 US $678.20 Rs. 100,000.00 US $542.56
Senior Manager Rs. 175,000.00 US $949.48 Rs. 150,000.00 US $813.84
Employer has to contribute 12% for Provident Fund and 3% for Trust Fund of the above

Construction Charges :

Factory Building – Approximately Rs. 40,000.00 per sq.mtr Warehouse – Approximately Rs. 36,000.00 per sq.mtr

Fuel Price :

Petrol – Rs. 137.00 per ltr Diesel – Rs. 104.00 per ltr

Transport Cost :

20′ Container – Rs. 200.00 per Km 40′ Container – Rs. 250.00 per Km

Power Tariff : Ceylon Electricity Board

Mr. S S M Abeysekara

Senior Deputy Director (Mirijjawila EPZ)

Telephone: 047-2258800

Mobile       : 076- 4803197